How Deep to Set Fence Posts: Hole Depth, Width & Concrete

The ⅓ rule measured two ways, frost line depth, 3× post-width holes, gravel bases and how many bags of concrete each fence post hole takes.

Updated October 18, 2026

The short answer

Post-setting instructions put between ⅓ and ½ of the fence’s above-ground height in the ground. For a 6 ft fence that is a 2–3 ft hole. Make the hole about 3 times as wide as the post. Where the ground freezes, go below the frost line. Trex’s fence instructions call for holes about 12 in across and at least 30 in deep, deeper where local codes or frost lines require it.

Post length = fence height + hole depth

The ⅓ rule, measured two ways

Everyone quotes “bury a third of the post,” but the sources measure that third from different things:

  • Sakrete: hole depth about ⅓ of the post’s height above ground. Its example is a 6 ft fence in a 2 ft hole, on an 8 ft post.
  • Quikrete: hole depth ⅓ of the overall post length, plus 6 in for a gravel base. If a third of the post is buried, the two-thirds above ground is twice as long as the buried part. So this rule buries ½ of the above-ground height: a 6 ft fence on a 9 ft post, with 3 ft in the ground.

Both are rules of thumb, not engineered depths. Your local building code or the fence maker’s instructions take priority over either one.

Hole depth by fence height

Depth of the post in the ground, before any gravel base:

Fence height⅓ of height (Sakrete)½ of height (Quikrete)
4 ft16 in24 in
5 ft20 in30 in
6 ft24 in36 in
8 ft32 in48 in

Our Fence Calculator uses the ⅓ rule with a floor of 24 in (600 mm), so short fences still get a 2 ft hole. To use the deeper rule or your frost depth, enter the hole depth under Advanced options.

The frost line

Where the ground freezes in winter, a post whose bottom sits in freezing soil can be pushed up by frost heave. Sakrete says to dig below your region’s frost line for this reason. Quikrete says a post that carries a structure, such as a deck, must go at least 6 in below the frost line. Frost depth varies by location, and your local building department can tell you what it is. Where it is deeper than the rule of thumb, it decides the depth.

Hole diameter

Quikrete and Sakrete both say to make the hole about 3 times the width of the post. Using the post’s actual width:

PostActual widthHole diameter (3×)
4×43½ in10½ in
6×65½ in16½ in

Sakrete’s own example puts a 4 in post in a 12 in hole, and it suggests making the hole wider at the bottom than at the top. Quikrete says to dig larger, dish-shaped holes in loose or sandy soil.

The gravel base

Both concrete makers put gravel or crushed stone in the bottom of the hole for drainage. Quikrete calls for 6 in and Sakrete for 4–6 in, compacted with the end of the post. Add that to the hole depth when you dig.

Protecting Wood Fences for Yard and Garden, a University of Wisconsin-Extension bulletin written by USDA Forest Products Laboratory scientists, adds a caution. Crushed rock helps water drain away from posts in light soils. In clay it can trap a pool of water around the base of the post, and termites can travel through it.

Concrete or gravel backfill

The same bulletin says the post itself matters most, because posts usually fail from rot at the ground line. Use posts pressure-treated for ground contact, or posts that are mostly heartwood of a decay-resistant species.

  • Concrete is what the Wisconsin bulletin suggests where a post needs added stability. With Quikrete Fast-Setting Concrete you pour the dry mix to 3–4 in below the top of the hole and add about 1 gallon of water per 50 lb bag. In holes deeper than 30 in, fill and water the first 30 in, then add the rest. Top the hole off with soil. It sets in 20–40 minutes, and Quikrete says to wait 4 hours before putting any strain on the post.
  • Crushed rock drains well in light soils (see the caution above about clay). The Wisconsin bulletin also warns against a concrete collar that reaches the surface, because it traps water against the post. Quikrete’s instructions also finish the top 3–4 in with soil, not concrete.

Worked example: concrete for a 6 ft fence

One 4×4 post (3½ in), 6 ft above ground, with the ⅓ rule and a 3× hole. The concrete fills the hole minus the space the post takes up:

Hole depth   6 ft ÷ 3 = 24 in
Hole width   3 × 3.5 in = 10.5 in
Hole volume  π × 5.25² × 24 = 2,078 cu in
Post         3.5 × 3.5 × 24 =   294 cu in
Concrete     2,078 − 294 = 1,784 cu in ÷ 1,728 = 1.03 cu ft
Bags         1.03 ÷ 0.375 cu ft per 50 lb bag = 2.75 bags per post
Post length  6 ft + 2 ft = 8 ft

Quikrete gives the 0.375 cu ft yield for a 50 lb bag of Fast-Setting Concrete. For a whole fence, add up the posts before rounding: 10 posts need 27.5 → 28 bags, not 30. This fills the full hole depth with concrete, so a gravel base and a soil cap leave you a little spare.

In metric

The figures above are in US units, as the manufacturers and standards give them. Here they are in metric, converted with the same factors the calculators use. Switch any calculator to m · cm to work in metric from the start.

Figure in this guideUSMetric
Fence height, 6 ft6 feet≈ 1.83 m
Hole depth, 2 ft2 feet≈ 0.61 m
Hole depth, 3 ft3 feet≈ 0.91 m
Hole width, 12 in12 inches≈ 305 mm
Minimum hole depth, 30 in30 inches≈ 762 mm
Post length, 8 ft8 feet≈ 2.44 m
Post length, 9 ft9 feet≈ 2.74 m

Calculate it for your project

The Fence Calculator counts posts, panels or pickets, rails and the concrete bags for every post hole. For footings or other holes, the Concrete Calculator handles round columns. Planning the whole fence? Use the fence planner.