Pour a concrete slab

Choose what you're pouring, enter the dimensions, and the planner works out volume, waste, bags or ready-mix, the gravel base and reinforcement — then compares the cost of a truck against bags.

  1. 01 Project type
  2. 02 Dimensions
  3. 03 Volume & waste
  4. 04 Bags or ready-mix
  5. 05 Base & reinforcement
  6. 06 Cost
  7. 07 Summary
  1. Step 1: Project type

    What are you pouring?

    What are you pouring?

    Patio, walkway, driveway, shed base

  2. Step 2: Dimensions

    Measure inside the forms.

    4 in for patios and walkways, 5–6 in for driveways.

    Identical pieces, e.g. 6 deck footings.

    Concrete volume
    1.23 cu yd
    Same volume
    33 cu ft
  3. Step 3: Waste

    A little extra so you never run short mid-pour.

    Waste allowance

    Covers uneven ground, form bowing and spillage. 5–10% is standard.

    Waste allowance
    10%
    Volume to order
    1.36 cu yd
  4. Step 4: Bags or ready-mix

    Small pours suit bags; larger ones suit a truck.

    Bag size

    0.60 cu ft per bag

    80 lb premix bags
    62 bags
    Or ready-mix
    1.5 cu yd
    Approximate weight
    5,494 lb
  5. Step 5: Base & reinforcement

    For slabs: compacted gravel underneath and steel inside.

    0 to skip.

    Reinforcement
    Gravel base1.99 tons
    1.42 cu yd
    Rebar, 20 ft bars
    8 bars
  6. Step 6: Cost

    Compare a delivery against bags with your prices.

    per cu yd

    Often charged for orders under 4–6 yards.

    per bag
    per ton
    per 20 ft bar
    Ready-mix (incl. fees)
    $247.50
    Premix bags
    $403.00
    Gravel and reinforcement
    $161.44
    Estimated material costusing bags, as ordered above
    $564.44

MeasureToBuy · project summary

Concrete pour estimate

Buy 62 80 lb bags of premix concrete.

Measurements

  • What are you pouring?: Slab
  • Length: 10 ft
  • Width: 10 ft
  • Thickness: 4 in
  • How many: 1
  • Bag size: 80 lb
  • Gravel base depth: 4 in
  • Reinforcement: Rebar grid
  • Rebar spacing: 18 in

Key figures

Concrete volume
1.23 cu yd
Same volume
33 cu ft
Waste allowance
10%
Volume to order
1.36 cu yd

Shopping list

80 lb premix bags
62 bags
Gravel base1.99 tons
1.42 cu yd
Rebar, 20 ft bars
8 bars

Material cost

Ready-mix (incl. fees)
$247.50
Premix bags
$403.00
Gravel and reinforcement
$161.44
Estimated material costusing bags, as ordered above
$564.44

Calculators provide planning estimates. Actual material requirements vary with product specifications, installation method, site conditions, local codes and project complexity.

Before you start

  • Measure inside the forms, and check the subgrade is level — dips add hidden volume.
  • Know your access: can a ready-mix truck reach the pour, or will you need a pump or wheelbarrows?
  • Check local requirements for slab thickness, reinforcement and permits.

Questions about this project

Is it cheaper to mix concrete myself?

For under about a cubic yard, bags are usually cheaper. Above that, ready-mix typically wins even with a short-load fee — and it's far less physical work.

How long before I can walk on new concrete?

Usually 24–48 hours for foot traffic and about a week for cars, though concrete keeps gaining strength for 28 days.