Project planner
Pour a concrete slab
Choose what you're pouring, enter the dimensions, and the planner works out volume, waste, bags or ready-mix, the gravel base and reinforcement — then compares the cost of a truck against bags.
- 01 Project type
- 02 Dimensions
- 03 Volume & waste
- 04 Bags or ready-mix
- 05 Base & reinforcement
- 06 Cost
- 07 Summary
Step 1: Project type
What are you pouring?
Step 2: Dimensions
Measure inside the forms.
4 in for patios and walkways, 5–6 in for driveways.
Identical pieces, e.g. 6 deck footings.
- Concrete volume
- 1.23 cu yd
- Same volume
- 33 cu ft
Step 3: Waste
A little extra so you never run short mid-pour.
- Waste allowance
- 10%
- Volume to order
- 1.36 cu yd
Step 4: Bags or ready-mix
Small pours suit bags; larger ones suit a truck.
- 80 lb premix bags
- 62 bags
- Or ready-mix
- 1.5 cu yd
- Approximate weight
- 5,494 lb
Step 5: Base & reinforcement
For slabs: compacted gravel underneath and steel inside.
0 to skip.
- Gravel base1.99 tons
- 1.42 cu yd
- Rebar, 20 ft bars
- 8 bars
Step 6: Cost
Compare a delivery against bags with your prices.
per cu ydOften charged for orders under 4–6 yards.
per bagper tonper 20 ft bar- Ready-mix (incl. fees)
- $247.50
- Premix bags
- $403.00
- Gravel and reinforcement
- $161.44
- Estimated material costusing bags, as ordered above
- $564.44
MeasureToBuy · project summary
Concrete pour estimate
Buy 62 80 lb bags of premix concrete.
Measurements
- What are you pouring?: Slab
- Length: 10 ft
- Width: 10 ft
- Thickness: 4 in
- How many: 1
- Bag size: 80 lb
- Gravel base depth: 4 in
- Reinforcement: Rebar grid
- Rebar spacing: 18 in
Key figures
- Concrete volume
- 1.23 cu yd
- Same volume
- 33 cu ft
- Waste allowance
- 10%
- Volume to order
- 1.36 cu yd
Shopping list
- 80 lb premix bags
- 62 bags
- Gravel base1.99 tons
- 1.42 cu yd
- Rebar, 20 ft bars
- 8 bars
Material cost
- Ready-mix (incl. fees)
- $247.50
- Premix bags
- $403.00
- Gravel and reinforcement
- $161.44
- Estimated material costusing bags, as ordered above
- $564.44
Calculators provide planning estimates. Actual material requirements vary with product specifications, installation method, site conditions, local codes and project complexity.
Before you start
- Measure inside the forms, and check the subgrade is level — dips add hidden volume.
- Know your access: can a ready-mix truck reach the pour, or will you need a pump or wheelbarrows?
- Check local requirements for slab thickness, reinforcement and permits.
Questions about this project
Is it cheaper to mix concrete myself?
For under about a cubic yard, bags are usually cheaper. Above that, ready-mix typically wins even with a short-load fee — and it's far less physical work.
How long before I can walk on new concrete?
Usually 24–48 hours for foot traffic and about a week for cars, though concrete keeps gaining strength for 28 days.
Calculators used in this project
Need just one number? Each step is also a stand-alone calculator.
- Concrete CalculatorCubic yards and bags for slabs, footings, columns and walls.
- Concrete Slab CalculatorSlab volume with thickened edges, gravel base and rebar.
- Concrete Bag CalculatorPremix bags by size, with water and weight.
- Gravel CalculatorGravel and crushed stone in yards and tons.
- Concrete Cost CalculatorReady-mix vs bags, compared with your prices.