Measure the patio once and this planner carries it through excavation depth, compacted base, bedding sand, pavers, joint sand and edging, ending in a shopping list and a material cost.

  1. 01 Patio area
  2. 02 Excavation and base
  3. 03 Pavers
  4. 04 Sand and edging
  5. 05 Cost
  6. 06 Summary
  1. Step 1: Patio area

    Measure the paved area and say what it's for — driveways need a deeper base.

    Patio shape

    Measure length × width; add more for L-shapes

    What is it for?

    Foot traffic

    Patio area
    144 sq ft
  2. Step 2: Excavation and base

    ICPI minimums: 4–6 in of compacted base under patios and walks, 6–8 in under driveways.

    ICPI minimums: 4–6 in for walks and patios, 6–8 in for driveways. Deeper on clay or in frost areas.

    2⅜ in (60 mm) for patios and home driveways; 3⅛ in (80 mm) for regular vehicle traffic.

    Excavation depthbase + bedding + paver
    7.4 in
    Soil to remove
    3.28 cu yd
    Compacted base
    4 in
    Base gravel (crusher run)2.04 cu yd incl. 15% compaction
    3.17 tons
  3. Step 3: Pavers

    Paver size and a waste allowance for your laying pattern.

    Waste allowance

    Rule of thumb for cuts and breakage; curved edges and 45° patterns cut the most.

    Pavers per sq ft
    4.5
    Pavers before waste
    648
    Waste allowance
    10%
    Pavers to buy
    713 pavers
  4. Step 4: Sand and edging

    1 in of bedding sand, polymeric sand for the joints and edge restraint on the open sides.

    Screeded to 1 in (25 mm).

    sq ft per 50 lb bag

    From your bag: Alliance Gator lists 65–85 sq ft for ⅛–⅜ in joints and 22–42 sq ft for ¾–1¼ in joints.

    Sides that butt a house or slab don't need edge restraint.

    Bedding sand0.44 cu yd at 1 in
    0.6 tons
    Or 50 lb sand bags
    24 bags
    Polymeric joint sand
    3 bags
    Edge restraintExposed sides only
    48 ft
  5. Step 5: Cost

    Enter your supplier's prices. Nothing is guessed.

    per paver
    per tons
    per 50 lb / 25 kg bag
    per bag
    per ft
    Pavers
    $534.75
    Base gravel
    $142.60
    Bedding sand
    $120.00
    Polymeric sand
    $105.00
    Edge restraint
    $72.00
    Total materials
    $974.35

MeasureToBuy · project summary

Paver patio project

You need 713 pavers for 144 sq ft, including 10% for cuts.

Measurements

  • Patio shape: Rectangles
  • Patio: length 12 ft, width 12 ft
  • What is it for?: Patio or walkway
  • Paver size: 4 × 8 in
  • Compacted base depth: 4 in
  • Bedding sand: 1 in
  • Paver thickness: 2.375 in
  • Polymeric sand coverage: 65
  • Edge against a wall or existing paving: 0 ft

Key figures

Patio area
144 sq ft
Excavation depthbase + bedding + paver
7.4 in
Soil to remove
3.28 cu yd
Compacted base
4 in
Base gravel (crusher run)2.04 cu yd incl. 15% compaction
3.17 tons

Shopping list

Base gravel (crusher run)2.04 cu yd incl. 15% compaction
3.17 tons
Pavers to buy
713 pavers
Or 50 lb sand bags
24 bags
Polymeric joint sand
3 bags
Edge restraintExposed sides only
48 ft

Material cost

Pavers
$534.75
Base gravel
$142.60
Bedding sand
$120.00
Polymeric sand
$105.00
Edge restraint
$72.00
Total materials
$974.35

Compact the base in layers no thicker than your plate compactor can handle (ICPI: typically 4–6 in lifts). Buy a few spare pavers from the same batch for future repairs — colour varies between runs.

Calculators provide planning estimates. Actual material requirements vary with product specifications, installation method, site conditions, local codes and project complexity.

Before you start

  • Call 811 (or your local utility locator) before you dig.
  • Plan a slight slope away from the house so water drains off the patio.
  • Rent a plate compactor — the base has to be compacted in layers to last.

Questions about this project

How deep do I dig for a paver patio?

Base depth plus 1 in of sand plus the paver thickness. With ICPI's 4 in minimum base and 2⅜ in pavers, that's about 7⅜ in below the finished surface.

Can I lay pavers on sand alone?

No — the compacted crushed-stone base carries the load and drains water. Sand alone washes out and settles.

Calculators used in this project

Need just one number? Each step is also a stand-alone calculator.